Gas piping inspections due by 12/31/2026, by community district
Local Law 152 assigns each community district a year. This year it's CDs 4, 6, 8, 9 and 16 in every borough: buildings.
Facades marked UNSAFE, by borough
Current FISP/Local Law 11 status UNSAFE. Owners must put up sidewalk protection and repair.
Boilers with no 2026 inspection filed, by borough
Boilers inspected in 2025 with no 2026 report on file yet. The cycle ends 12/31/2026.
Download the numbers
CSV, CC BY 4.0: LL152 by district · facades by borough · boilers by borough · all (zip)
Caveat: the city doesn't publish which buildings have already filed this LL152 round, so some are done. Check DOB NOW for any single building. Not affiliated with NYC DOB.
The full district table, plus building-level lists for contractors and managers, is on the main page.